44
Bridge Balancing and Verification
Make sure then NI DAQ box is turned on before starting the VI. Adjust the measurement
time to 0.01 second on the LabVIEW program to view instant strain readings. Use the offset
potentiometer to adjust the output voltage to 2.5V, which is half of the output range.
Connect shunt resistors parallel to the active gauge, and observe appropriate change in
the strain reading.
Gently press on the tap of the can, and observe the strain readings change accordingly.
Take Measurements
Allow the amplifier to warm up for 5 minutes before taking measurements.
For each beam, continuously pluck the end of the cantilever for 30 seconds and record the
vibration decay curves.
Comentários a estes Manuais